Tag No.Tag IDTag DescriptionProject IDLocationUoMCalibratedCertificate No.Interval(เดือน)Next CalibrateOPC Address
1 B1RDF_F01 RDF-A-Feed SPP 18 MW CFB Boiler#1 t/h 18/10/2022 EI.F-W4420 6 18/04/2023 \\128.190.0.250\ICONICS.IconicsOPCUAServer.V5\PLC_WHRP.CFB.B1RDF_F01
2 B1CHC_FLOWRATE RDF-B-Feed SPP 18 MW CFB Boiler#1 t/h 18/10/2022 EI.F-W4310 6 18/04/2023 \\128.190.0.250\ICONICS.IconicsOPCUAServer.V5\PLC_WHRP.CFB.B1CHC_FLOWRATE
3 B1CHB_CBX_1A RDF-D-Feed SPP 18 MW CFB Boiler#1 t/h 18/10/2022 EI.F-W4310 6 18/04/2023 \\128.190.0.250\ICONICS.IconicsOPCUAServer.V5\PLC_WHRP.CFB.B1CHB_CBX_1A
4 B1SGG_FT_2 Overheated Steam Flow to TG3 SPP 18 MW CFB Boiler#1 t/h 10/10/2022 EI.22-W4310-27 24 10/10/2024 \\128.190.0.250\ICONICS.IconicsOPCUAServer.V5\PLC_WHRP.TURB3.B1SGG_FT_2
5 B1SGG_TT_2 Tempurature of Steam Flow to TG3 SPP 18 MW CFB Boiler#1 deg.C 10/10/2022 EI.22-W4310-29 24 10/10/2024 \\128.190.0.250\ICONICS.IconicsOPCUAServer.V5\PLC_WHRP.TURB3.B1SGG_TT_2
6 B1SGG_PT_4 Outlet Steam Pressure SPP 18 MW CFB Boiler#1 MPa 10/10/2022 EI.22-W4310-28 24 10/10/2024 \\128.190.0.250\ICONICS.IconicsOPCUAServer.V5\PLC_WHRP.TURB3.B1SGG_PT_4
7 B1SGG_ET_2 Energy Flow Steam to TG3 SPP 18 MW CFB Boiler#1 MJ/s 02/02/2022 SMN-21-L433 24 02/02/2024 \\128.190.0.250\ICONICS.IconicsOPCUAServer.V5\FLOW_COMM.FLOW_COMM_CFB.FLOW_COM_CFB_MJ
7 Flowcom of Number 7 FlowCom.YTD of (7) SPP 18 MW CFB Boiler#1 MJ 04/02/2022 SMN-21-L433 24 04/02/2024 \\128.190.0.250\ICONICS.IconicsOPCUAServer.V5\FLOW_COMM.FLOW_COMM_CFB.FLOW_COM_CFB_ACC
8 T3SGG_FT_2 Overheated Steam WHRP Flow SPP 18 MW TG#3 t/h 03/10/2022 EI.22-W4310-67 24 03/10/2024 \\128.190.0.250\ICONICS.IconicsOPCUAServer.V5\PLC_WHRP.TURB3.T3SGG_FT_2
9 T3SGG_TT_2 Tempurature of Steam WHRP Flow SPP 18 MW TG#3 deg.C 06/10/2022 EI.22-W4310-71 24 06/10/2024 \\128.190.0.250\ICONICS.IconicsOPCUAServer.V5\PLC_WHRP.TURB3.T3SGG_TT_2
10 T3SGG_PT_2 Pressure of Steam WHRP Flow SPP 18 MW TG#3 MPa 04/10/2022 EI.22-W4310-69 24 04/10/2024 \\128.190.0.250\ICONICS.IconicsOPCUAServer.V5\PLC_WHRP.TURB3.T3SGG_PT_2
11 Flowcom of Number 11 FlowCom.YTD of (11) SPP 18 MW TG#3 MJ 04/02/2022 SMN-21-L435 24 04/02/2024 \\128.190.0.250\ICONICS.IconicsOPCUAServer.V5\FLOW_COMM.FLOW_COMM_TG3.FLOW_COM_TG3_ACC
11 T3SGG_ET_2 Energy Flow Steam WHRP SPP 18 MW TG#3 MJ/s 02/02/2022 SMN-21-L435 24 02/02/2024 \\128.190.0.250\ICONICS.IconicsOPCUAServer.V5\FLOW_COMM.FLOW_COMM_TG3.FLOW_COM_TG3_MJ
12 T3SGG_FT_1 Inlet Steam Flow Rate SPP 18 MW TG#3 t/h 03/10/2022 EI.22-W4310-66 24 03/10/2024 \\128.190.0.250\ICONICS.IconicsOPCUAServer.V5\PLC_WHRP.TURB3.T3SGG_FT_1
13 T3SGG_TT_1 Inlet Steam Temperature SPP 18 MW TG#3 deg.C 05/10/2022 EI.22-W4310-70 24 05/10/2024 \\128.190.0.250\ICONICS.IconicsOPCUAServer.V5\PLC_WHRP.TURB3.T3SGG_TT_1
14 T3SGG_PT_1 Inlet Steam Pressure SPP 18 MW TG#3 MPa 04/10/2022 EI.22-W4310-68 24 04/10/2024 \\128.190.0.250\ICONICS.IconicsOPCUAServer.V5\PLC_WHRP.TURB3.T3SGG_PT_1
15 Flowcom of Number 15 FlowCom.YTD of (15) SPP 18 MW TG#3 MJ 04/02/2022 SMN-21-L434 24 04/02/2024 \\128.190.0.250\ICONICS.IconicsOPCUAServer.V5\FLOW_COMM.FLOW_COMM_WHRP.FLOW_COM_WHRP_ACC
15 T3SGG_ET_1 Energy Flow Inlet Steam SPP 18 MW TG#3 MJ/s 02/02/2022 SMN-21-L434 24 02/02/2024 \\128.190.0.250\ICONICS.IconicsOPCUAServer.V5\FLOW_COMM.FLOW_COMM_WHRP.FLOW_COM_WHRP_MJ
16 P2EEE_GRPL_3_AI9 Generator#3 Output Power SPP 18 MW TG#3 MW 02/11/2020 LQN181024200043 12 02/11/2021 \\128.190.0.250\ICONICS.IconicsOPCUAServer.V5\PLC_WHRP.TURB3.P2EEE_GRPL_3_AI9
17 B1CCB_CBX_1_AI1 Gas emission SO2 content SPP 18 MW CFB Boiler#1 PPm 21/11/2022 EI.22.Cems 3 21/02/2023 \\128.190.0.250\ICONICS.IconicsOPCUAServer.V5\PLC_WHRP.CFB.B1CCB_CBX_1_AI1
18 B1CCB_CBX_1_AI2 Gas emission NOX content SPP 18 MW CFB Boiler#1 PPm 21/11/2022 EI.21.Cems 3 21/02/2023 \\128.190.0.250\ICONICS.IconicsOPCUAServer.V5\PLC_WHRP.CFB.B1CCB_CBX_1_AI2
19 B1CCB_CBX_1_AI3 Dust SPP 18 MW CFB Boiler#1 mg/m3 21/11/2022 EI.22.Cams 3 21/02/2023 \\128.190.0.250\ICONICS.IconicsOPCUAServer.V5\PLC_WHRP.CFB.B1CCB_CBX_1_AI3
20 B1CCB_CBX_1_AI4 Gas emission oxygen content SPP 18 MW CFB Boiler#1 %vol 21/11/2022 EI.22.Cems 3 21/02/2023 \\128.190.0.250\ICONICS.IconicsOPCUAServer.V5\PLC_WHRP.CFB.B1CCB_CBX_1_AI4
21 B1CCB_CBX_1_AI5 Gas emission pressure SPP 18 MW CFB Boiler#1 Pa 21/10/2022 EI.22-W4310 24 21/10/2024 \\128.190.0.250\ICONICS.IconicsOPCUAServer.V5\PLC_WHRP.CFB.B1CCB_CBX_1_AI5
22 B1CCB_CBX_1_AI6 Gas emission temperature SPP 18 MW CFB Boiler#1 deg.C 21/10/2022 EI.22-W4310 24 21/10/2024 \\128.190.0.250\ICONICS.IconicsOPCUAServer.V5\PLC_WHRP.CFB.B1CCB_CBX_1_AI6
23 B1CCB_CBX_1_AI7 Gas emission flow SPP 18 MW CFB Boiler#1 m3/h 21/10/2022 EI.22-W4310 24 21/10/2024 \\128.190.0.250\ICONICS.IconicsOPCUAServer.V5\PLC_WHRP.CFB.B1CCB_CBX_1_AI7
24 S1ASF_TT_1A1 #1 SP Boiler superheater inlet gas temperature left SPP 18 MW SP#1 deg.C 07/11/2022 EI.22-W4310-54 24 07/11/2024 \\128.190.0.250\ICONICS.IconicsOPCUAServer.V5\PLC_WHRP.TURB3.S1ASF_TT_1A1
25 S1ASF_TT_1B1 #1 SP Boiler superheater inlet gas temperature right SPP 18 MW SP#1 deg.C 07/11/2022 EI.22-W4310-55 24 07/11/2024 \\128.190.0.250\ICONICS.IconicsOPCUAServer.V5\PLC_WHRP.TURB3.S1ASF_TT_1B1
26 S1SGI_TT_1A1 #1 SP Boiler #4 flash outlet gas temperature left SPP 18 MW SP#1 deg.C 08/11/2022 EI.22-W4310-56 24 08/11/2024 \\128.190.0.250\ICONICS.IconicsOPCUAServer.V5\PLC_WHRP.TURB3.S1SGI_TT_1A1
27 S1SGI_TT_1B1 #1 SP Boiler #4 flash outlet gas temperature right SPP 18 MW SP#1 deg.C 08/11/2022 EI.22-W4310-57 24 08/11/2024 \\128.190.0.250\ICONICS.IconicsOPCUAServer.V5\PLC_WHRP.TURB3.S1SGI_TT_1B1
28 S2ASF_TT_1A1 #2 SP Boiler superheater inlet gas temperature left SPP 18 MW SP#2 deg.C 25/07/2022 EI.22-W4310-58 24 25/07/2024 \\128.190.0.250\ICONICS.IconicsOPCUAServer.V5\PLC_WHRP.TURB3.S2ASF_TT_1A1
29 S2ASF_TT_1B1 #2 SP Boiler superheater inlet gas temperature right SPP 18 MW SP#2 deg.C 25/07/2022 EI.22-W4310-59 24 25/07/2024 \\128.190.0.250\ICONICS.IconicsOPCUAServer.V5\PLC_WHRP.TURB3.S2ASF_TT_1B1
30 S2SGI_TT_1A1 #2 SP Boiler #4 flash outlet gas temperature left SPP 18 MW SP#2 deg.C 26/07/2022 EI.22-W4310-60 24 26/07/2024 \\128.190.0.250\ICONICS.IconicsOPCUAServer.V5\PLC_WHRP.TURB3.S2SGI_TT_1A1
31 S2SGI_TT_1B1 #2 SP Boiler #4 flash outlet gas temperature right SPP 18 MW SP#2 deg.C 26/07/2022 EI.22-W4310-61 24 26/07/2024 \\128.190.0.250\ICONICS.IconicsOPCUAServer.V5\PLC_WHRP.TURB3.S2SGI_TT_1B1
32 S3ASF_TT_1A1 #3 SP Boiler superheater inlet gas temperature left SPP 18 MW SP#3 deg.C 27/07/2022 EI.22-W4310-63 24 27/07/2024 \\128.190.0.250\ICONICS.IconicsOPCUAServer.V5\PLC_WHRP.TURB3.S3ASF_TT_1A1
33 S3ASF_TT_1B1 #3 SP Boiler superheater inlet gas temperature right SPP 18 MW SP#3 deg.C 27/07/2022 EI.22-W4310-62 24 27/07/2024 \\128.190.0.250\ICONICS.IconicsOPCUAServer.V5\PLC_WHRP.TURB3.S3ASF_TT_1B1
34 S3SGI_TT_1A1 #3 SP Boiler #4 flash outlet gas temperature left SPP 18 MW SP#3 deg.C 09/11/2022 EI.22-W4310-64 24 09/11/2024 \\128.190.0.250\ICONICS.IconicsOPCUAServer.V5\PLC_WHRP.TURB3.S3SGI_TT_1A1
35 S3SGI_TT_1B1 #3 SP Boiler #4 flash outlet gas temperature right SPP 18 MW SP#3 deg.C 09/11/2022 EI.22-W4310-65 24 09/11/2024 \\128.190.0.250\ICONICS.IconicsOPCUAServer.V5\PLC_WHRP.TURB3.S3SGI_TT_1B1
36 A1SGA_TT_017A #1 AQC Boiler HP superheater inlet gas temperature left SPP 18 MW AQC#1 deg.C 07/11/2022 EI.22-W4310-32 24 07/11/2024 \\128.190.0.250\ICONICS.IconicsOPCUAServer.V5\PLC_WHRP.TURB3.A1SGA_TT_017A
37 A1SGA_TT_017B #1 AQC Boiler HP superheater inlet gas temperature right SPP 18 MW AQC#1 deg.C 07/11/2022 EI.22-W4310-32 24 07/11/2024 \\128.190.0.250\ICONICS.IconicsOPCUAServer.V5\PLC_WHRP.TURB3.A1SGA_TT_017B
38 A1SGA_TT_018A #1 AQC Boiler #1 HP economizer outlet gas temperature left SPP 18 MW AQC#1 deg.C 08/11/2022 EI.22-W4310-33 24 08/11/2024 \\128.190.0.250\ICONICS.IconicsOPCUAServer.V5\PLC_WHRP.TURB3.A1SGA_TT_018A
39 A1SGA_TT_018B #1 AQC Boiler #1 HP economizer outlet gas temperature right SPP 18 MW AQC#1 deg.C 08/11/2022 EI.22-W4310-33 24 08/11/2024 \\128.190.0.250\ICONICS.IconicsOPCUAServer.V5\PLC_WHRP.TURB3.A1SGA_TT_018B
40 A2SGA_TT_017A #2 AQC Boiler HP superheater inlet gas temperature left SPP 18 MW AQC#2 deg.C 27/07/2022 EI.22-W4310-34 24 27/07/2024 \\128.190.0.250\ICONICS.IconicsOPCUAServer.V5\PLC_WHRP.TURB3.A2SGA_TT_017A
41 A2SGA_TT_017B #2 AQC Boiler HP superheater inlet gas temperature right SPP 18 MW AQC#2 deg.C 26/07/2022 EI.22-W4310-23 24 26/07/2024 \\128.190.0.250\ICONICS.IconicsOPCUAServer.V5\PLC_WHRP.TURB3.A2SGA_TT_017B
42 A2SGA_TT_018A #2 AQC Boiler #2 HP economizer outlet gas temperature left SPP 18 MW AQC#2 deg.C 28/07/2022 EI.22-W4310-24 24 28/07/2024 \\128.190.0.250\ICONICS.IconicsOPCUAServer.V5\PLC_WHRP.TURB3.A2SGA_TT_018A
43 A2SGA_TT_018B #2 AQC Boiler #2 HP economizer outlet gas temperature right SPP 18 MW AQC#2 deg.C 30/07/2022 EI.22-W4310-25 24 30/07/2024 \\128.190.0.250\ICONICS.IconicsOPCUAServer.V5\PLC_WHRP.TURB3.A2SGA_TT_018B
44 A3SGA_TT_017A #3 AQC Boiler HP superheater inlet gas temperature left SPP 18 MW AQC#3 deg.C 08/11/2022 EI.22-W4310-35 24 08/11/2024 \\128.190.0.250\ICONICS.IconicsOPCUAServer.V5\PLC_WHRP.TURB3.A3SGA_TT_017A
45 A3SGA_TT_017B #3 AQC Boiler HP superheater inlet gas temperature right SPP 18 MW AQC#3 deg.C 09/11/2022 EI.22-W4310-36 24 09/11/2024 \\128.190.0.250\ICONICS.IconicsOPCUAServer.V5\PLC_WHRP.TURB3.A3SGA_TT_017B
46 A3SGA_TT_018A #3 AQC Boiler #3 HP economizer outlet gas temperature left SPP 18 MW AQC#3 deg.C 09/11/2022 EI.22-W4310-37 24 09/11/2024 \\128.190.0.250\ICONICS.IconicsOPCUAServer.V5\PLC_WHRP.TURB3.A3SGA_TT_018A
47 A3SGA_TT_018B #3 AQC Boiler #3 HP economizer outlet gas temperature right SPP 18 MW AQC#3 deg.C 10/11/2022 EI.22-W4310-38 24 10/11/2024 \\128.190.0.250\ICONICS.IconicsOPCUAServer.V5\PLC_WHRP.TURB3.A3SGA_TT_018B
48 Aux. Fuel-YTD Aux. Fuel-YTD SPP3 (18MW) Aux. Fuel-YTD % 2 เกิดจากการคำนวณ
49 B9CHD-GRAB9-B9 RDF-A-Feeding SPP 18 MW CFB Boiler#9 t/h 20/12/2022 EI.F-W4310 6 20/06/2023 \\128.190.0.250\ICONICS.IconicsOPCUAServer.V5\PLC_WHRP.TURB3.BOIL9.B9CHD_RDF_A
50 B9CHD-GRAB10-B9 RDF-A-Feeding SPP 18 MW CFB Boiler#9 t/h 07/12/2022 EI.F-W4310 6 07/06/2023 \\128.190.0.250\ICONICS.IconicsOPCUAServer.V5\PLC_WHRP.TURB3.BOIL9.B9CHD_RDF_D
51 B9CCMS-01 Gas emission SO2 content SPP 18 MW CFB Boiler#9 PPm 21/11/2022 EI.22.Cems 3 21/02/2023 \\128.190.0.250\ICONICS.IconicsOPCUAServer.V5\PLC_WHRP.TURB3.BOIL9.B9CEMS_01
52 B9CCMS-02 Gas emission NOX content SPP 18 MW CFB Boiler#9 PPm 22/11/2022 EI.22.Cems 3 22/02/2023 \\128.190.0.250\ICONICS.IconicsOPCUAServer.V5\PLC_WHRP.TURB3.BOIL9.B9CEMS_02
53 B9CCMS-05 Dust SPP 18 MW CFB Boiler#9 mg/m3 21/11/2022 EI.22.Cems 3 21/02/2023 \\128.190.0.250\ICONICS.IconicsOPCUAServer.V5\PLC_WHRP.TURB3.BOIL9.B9CEMS_05
54 B9CCMS-03 Gas emission oxygen content SPP 18 MW CFB Boiler#9 %vol 21/11/2022 EI.22.Cems 3 21/02/2023 \\128.190.0.250\ICONICS.IconicsOPCUAServer.V5\PLC_WHRP.TURB3.BOIL9.B9CEMS_03
55 B9SGG_FT_1 Superheated Steam Flow SPP 18 MW CFB Boiler#9 t/h 19/07/2022 EI.22-W4310-48 24 19/07/2024 \\128.190.0.250\ICONICS.IconicsOPCUAServer.V5\PLC_WHRP.TURB3.BOIL9.B9SGG_FT_1
56 B9SGG_TT_1 Superheated Steam Tempurature SPP 18 MW CFB Boiler#9 deg.C 29/07/2022 EI.22-W4310-52 24 29/07/2024 \\128.190.0.250\ICONICS.IconicsOPCUAServer.V5\PLC_WHRP.TURB3.BOIL9.B9SGG_TT_1
57 B9SGG_PT_1 Superheated Steam Pressure SPP 18 MW CFB Boiler#9 MPa 29/07/2022 EI.22-W4310-50 24 29/07/2024 \\128.190.0.250\ICONICS.IconicsOPCUAServer.V5\PLC_WHRP.TURB3.BOIL9.B9SGG_PT_1
58 B9SGG_ET_1 Energy Flow Steam to TG3 SPP 18 MW CFB Boiler#9 MJ/s 04/02/2022 SMN-21-L436 24 04/02/2024 \\128.190.0.250\ICONICS.IconicsOPCUAServer.V5\FLOW_COMM.B9SGG_ET_1.FLOW_COM_CFB_MJ
59 B9SGG_FT_2 Superheated Steam Flow SPP 18 MW CFB Boiler#9 t/h 19/07/2022 EI.22-W4310-49 24 19/07/2024 \\128.190.0.250\ICONICS.IconicsOPCUAServer.V5\PLC_WHRP.TURB3.BOIL9.B9SGG_FT_2
60 B9SGG_TT_2 Superheated Steam Tempurature SPP 18 MW CFB Boiler#9 deg.C 29/07/2022 EI.22-W4310-53 24 29/07/2024 \\128.190.0.250\ICONICS.IconicsOPCUAServer.V5\PLC_WHRP.TURB3.BOIL9.B9SGG_TT_2
61 B9SGG_PT_2 Superheated Steam Pressure SPP 18 MW CFB Boiler#9 MPa 19/07/2022 EI.22-W4310-51 24 19/07/2024 \\128.190.0.250\ICONICS.IconicsOPCUAServer.V5\PLC_WHRP.TURB3.BOIL9.B9SGG_PT_2
62 B9SGG_ET_2 Energy Flow Steam to TG3 SPP 18 MW CFB Boiler#9 MJ/s 04/02/2022 SMN-21-L437 24 04/02/2024 \\128.190.0.250\ICONICS.IconicsOPCUAServer.V5\FLOW_COMM.B9SGG_ET_2.FLOW_COM_CFB_MJ

 